PROJECTS

//konrem.com.pl/wp-content/uploads/2017/06/2cieplownictwo-miejskie_426x283.jpg

HEAT ENGINEERING COMPANY IN THE OPOLE REGION

ECO Group specializes in generating, transmitting, distributing and sale of electricity and heat. The Group provides services in ten provinces in southwest Poland. The company has its own generation resources. All processes undergo strict technological regulations.

PROJECT

Modernization of fluidized-bed boiler

 

DEADLINE

2016

 

SERVICES
Power engineering:
- overhaul and modernization
- electrical network installation projects
- production of spare parts

 

INDUSTRY
District heating

 

PROJECT ENGINEER
mgr inż. Emil Klimek
T: (+48) 696 766 322

 

"The project required close cooperation with the customer at every stage of implementation and adapting to the strict regulations of the facility. Short completion time and the complex organizational structure of the recipient required a great deal of attention to detail, efficient flow of information, documents and approvals."

CHALLENGE

  • project and implementation of a solution to modernize the boiler dust extraction system and reduce the amount of dust in flue gas to below 100 mg/Nmᶾ
  • building aluminium thermal shield for the installation
  • connecting the new dust extraction system with the existing control system and boiler control
  • meeting strict health and safety requirements

SOLUTION

  • project and installation of a pulsating, self-cleaning filter with vertical bags

RESULT

  • reduction of dust emission to the atmosphere by 20,000 kg/year, reduction of dust in flue gas below 50 mg/Nmᶾ
  • designed system does not require service during normal operation and operated automatically, regardless of the temperature of the flue gas behind the boiler